Live Event Production for Kool & the Gang Insights
Audio Visual Integrators, Security Integration, Richmond, Events Integration
15695
wp-singular,portfolio_page-template-default,single,single-portfolio_page,postid-15695,wp-theme-bridge,bridge-core-3.2.0,qode-page-transition-enabled,ajax_fade,page_not_loaded,,qode-theme-ver-30.7,qode-theme-bridge,qode-portfolio-single-template-6,wpb-js-composer js-comp-ver-7.9,vc_responsive,elementor-default,elementor-kit-6

Kool and The Gang

About This Project

Case Study

Live Event Production for Kool & the Gang × B. Michelle — May 24

Client: Kool & the Gang (headliner) & B. Michelle (special guest)
Producer: Productive Events — Live Event Production & AV Integration | Serving VA · MD · DC
Venue: Portsmouth Pavilion
Date: 24 May

 

Project Objectives

  1. Concert-grade FOH coverage for 8,000+ attendees without noise-spill violations.
  2. Artist-first MON environment for B. Michelle, combining wedges and wireless IEMs.
  3. Rapid changeover between support and headliner sets with zero downtime.

 

System Design & Gear Package

Position

Console

Outboard / Stage IO

Loudspeaker System

Microphones & RF

FOH

Avid S6L-32D

Allen & Heath SQ-5 w/ GX 4816 (redundant utility desk)

d&b KSL line array — 20 × KSL8 (mains) & 4 × KSL12 (downfills)

d&b SL-SUB — 12 ×

Shure Axient digital (lead & BGV)

SE Electronics condensers (OH, horns, ambience)

Monitor World

DiGiCo SD10

d&b M4 wedges (10 mixes)

d&b Y7P front fills — 6 ×

d&b V8 tops + V-Sub (stereo ground stacks)

Shure PSM-IEM packs (16-ch)

All processing via d&b ArrayCalc & R1 control; networked clocking over AES67.

 

Execution Highlights

Phase

Key Actions

Outcome

Pre-production

Modeled SPL & coverage in ArrayCalc; pre-built console show files for each act.

30-minute on-site tuning window achieved.

Load-in (8 hrs)

Flown KSL array at 12 m trim; time-aligned subs & front fills; dual redundant fiber for FOH-stage tie-lines.

< 1 dB variance across audience zone; compliance with 98 dB A-slow local limit.

Sound-check

Scene-based snapshots for Kool & the Gang (full horn section) & B. Michelle (tracks + live band).

Seamless recall; artists approved in first pass.

Showtime

FOH engineer rode dynamic VCAs; MON engineer handled on-the-fly IEM tweaks via SD10’s Waves rack.

Zero RF drops, zero feedback events; crisp, impactful show.

Changeover

14-min set swap using pre-labeled loom & digital patch; SQ-5 used for walk-in music and emcee reads.

No dead air; promoter praised efficiency.

 

 

 

 

 

 

 

 

 

 

 

 

 

Measurable Results

  • 98 % coverage uniformity (±1 dB) verified with SMAART.
  • 0 technical interruptions across 2-hour program.
  • Artistsfeedback:
    “The in-ears were perfect out of the gate—rare on a festival stage.” — B. Michelles MD
  • Audience sentiment: Social posts highlighted studio-quality sound” and powerful, clean low end.”

 

Added Value

Advantage

How Productive Events Delivered

Scalable d&b inventory

KSL family ensured long-throw clarity while keeping weight under trim limit.

Dual-console workflow

FOH & MON isolated; quick virtual-sound-check using Pro Tools.

DMV-wide logistics

Gear pre-staged at our Northern VA warehouse; single-truck deployment cut freight costs 18 %.

 

 

 

 

 

 

 

 

Conclusion

Productive Events combined premium d&b line-array technology with A-list consoles (Avid S6L & DiGiCo SD10)to deliver a flawless concert experience for both Kool & the Gang and B. Michelle. Our meticulous pre-production, seasoned engineers, and region-wide logistics prove why promoters across Virginia, Maryland, and Washington, D.C. trust us for mission-critical live events.

Ready for Your Next Show?

At A Glance

Client: Kool & the Gang (headliner) & B. Michelle (special guest)
Producer: Productive Events — Live Event Production & AV Integration | Serving VA · MD · DC

Date
Category
Productive Events
Tags
Live Event Production Virginia